Detroit Edison Energy - Fermi Nuclear Plant
|
|
Challenge |
| Install temporary lighting system in an active torus in minimum time, requiring minimum number of installation technicians and minimum power supply lines. |
|
Solution |
| 50 magnetically mounted 4210 light fixtures plugged into 5 custom built 10 outlet power supply lines with special receptacles. |
|
|
|
Results |
- Critical path project was completed on time with zero failures.
- Bonus benefit: Due to unique polyurethane construction, all 4210 fixtures salvaged after outage, decontaminated of radioactive material and returned to service.
|
|